TitleProduct

2-in-1 Blender, 300W Motor, Safety Interlock, 1.25L Blender Jar with Ingredient Adding Cap, Dry Mill

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-16 17:05

  • Browse the number:

    143

Send an inquiries

Company Profile

Hifast Industrial Co. Limited

By certification [File Integrity]

Contact: geuwa(Mr.)  

Telephone:

Area: Beijing

Address: Beijing

Website: http://geuwa.bdsfmj.com/

Product details
Model Number: B23 Blender 2 in 1 Brand Name: KUAIDE, GRAND Key Specifications/Special Features: Specifications:Functions: blend, millMaterials: ABS, PE, PP, stainless steel and ASColor: whiteMotor: 7025
  • Plug: BS/VDE
  • Rated voltage: 110/220/240V
  • Power: 300W
  • Speed: 18,000rpm
  • Features:
    • Pure copper motor
    • 1,250mL blender jar with ingredient adding cap
    • 300W motor and safety switch
    • 2 speeds and pulse rotation revolving switch control
    • Dry mill attachment
    • Stainless steel cutting blades
  • Packing:
    • Inner box: 1 set/gift box (32.5x19.8x32cm)
    • Carton dimensions: 81 x 35 x 66cm
    • Quantity/master carton: 8 pieces/carton
    • Net weight: 17.5kg
    • Gross weight: 19.5kg
  • Loading quantity:
    • 20ft container: 1,080 pieces
    • 40ft container: 2,216 pieces
    • 40ft HQ container: 2,840 pieces
  • How to use blender:
    • Be sure to tighten container base completely
    • Place ingredients in container
    • Place container on motor housing
    • Plug-in select one of two speed buttons as per your required
    • Use pulse switch for precision blending
    • After blending, switch of f(0) unplug
  • How to use mill:
    • Step 1: turn mill upside down and remove cutter base
    • Step 2: place ingredients in container
    • Step 3: tightly screw cutter base onto container
    • Step 4: place mill on motor housing
    • Step 5: plug-in hold mill and switch on (speed 2)
    • Step 6: after grinding switch off (0) unplug
  • Shipping Information:
    • FOB Port: Shenzhen
    • Lead Time: 40 - 45 days
    Main Export Markets:
    • Asia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    • North America
    • Western Europe